911勛圖 is dedicated to maintaining a safe and healthy environment for everyone on campus, including contractors. The sections below outline 911勛圖's contractor safety management framework and the specific requirements for high-risk work activities. All contractors are required to thoroughly review and understand the information provided on this webpage.
Lockout
De-energization and Lockout is a regulatory requirement and industry wide practice where any equipment, machinery or source that have stored or active energy are methodically isolated and physical impaired. De-energization and Lockout are written document(s) that is specific and very detail to properly de-enegize, lockout, unlock and re-energize a specific equipment, machinery or source.
Contractors are required to have their own lockout program. In addition, site specific detail de-energization and lockout procedures must be developed with consulation with 911勛圖, prior to implementing the procedure to the specific job on campus.
It is very common that 911勛圖 Facilities Services staff will be directly involved in the process of de-energization and lockout with contractors for 911勛圖 owned systems, such as electrical, district energy system, and anything that is overseen by 911勛圖 Facilities Services.
Required Documentation:
- A company���s written Lockout program that outlines a minimum of:
- Lockout procedures
- Policy and requirements
- Responsibilities
- Regulation and standards
- Training and education
- Hazard/risk identification and Assessments.
- A site-specific lockout procedure for any of the following systems:
- District Energy Systems, Domestic Water Systems, Electrical Systems, Gas Systems, Hot Water Systems, HVAC Systems
Requirement: